Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District- Aurangabad, State- Bihar

Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Dhamni, Barun, Aurangabad, Bihar. The site covers 49.4 acres. Its stated project cost is ₹6.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 May 2024).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Dhamni, Barun, Aurangabad, Bihar. The site covers 49.4 acres.

Who is building it?

The applicant is Jyoti Mining LLP.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 May 2024), as of 27 Nov 2026.

Where is it?

In Dhamni, Barun, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹6.2 crore and a site of 49.4 acres.

When was it filed?

The application was filed on 20 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District-…

Project details

StatusCleared for impact study
Status since24 May 2024
Application filed20 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJyoti Mining LLP
Land area49.4 acres (20 ha)
Project cost₹6.2 crore
Village / localityDhamni
Taluk / tehsilBarun
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00769

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Jun 2025Environmental approval granted49.4 acres₹6.2 crore
Early planning filed 20 May 2024 (this page)Cleared for impact study49.4 acres₹6.2 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 49.4 acres, this one is smaller than 77% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 93.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Dhamni, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.