Quick answers
What is this project?
Proposed Sand Mining Project Aurangabad Sone-25-A on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Dhamni, Barun, Aurangabad, Bihar. The site covers 44.2 acres.
Who is building it?
The applicant is Shisupal Prasad Verma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Mar 2025), as of 27 Nov 2026.
Where is it?
In Dhamni, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹5.5 crore and a site of 44.2 acres.
When was it filed?
The application was filed on 28 Jan 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Mar 2025 |
| Application filed | 28 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shisupal Prasad Verma |
| Land area | 44.2 acres (17.9 ha) |
| Project cost | ₹5.5 crore |
| Village / locality | Dhamni |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01268 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 44.2 acres, this one is smaller than 77% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 93.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Dhamni, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District-… — environmental approval granted, 200 m away
- Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District-… — cleared for impact study, 200 m away
- Proposed Sand Mining Project of Area 31.60 Ha at Aurangabad Sone- 23C Sand… — lapsed, 850 m away
- Proposed Sand Mining Project of Area 31.60 Ha at Aurangabad Sone- 23C Sand… — cleared for impact study, 850 m away
- Proposed Sand Mining Project of Area 86.99 Ha at Aurangabad Sone- 26 Sand Ghat… — environmental approval granted, 950 m away
- Proposed Sand Mining Project of Area 86.99 Ha at Aurangabad Ghat 26 on Sone… — cleared for impact study, 950 m away
- Proposed Sand Mining Project of Area 86.99 Ha at Aurangabad Ghat 26 on Sone… — environmental approval granted, 950 m away
- Proposed Sand Mining Project- Aurangabad Son 23-B Sand Ghat — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.