Quick answers
What is Proposed Sand Mining Project- Aurangabad Son 23-B Sand Ghat?
Proposed Sand Mining Project- Aurangabad Son 23-B Sand Ghat is an approved mining project in Kemda, Barun, Aurangabad, Bihar. The site covers 69.2 acres.
Who is building it?
The applicant is Ravi Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Dec 2025), as of 27 Nov 2026.
Where is it?
In Kemda, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹8.4 crore and a site of 69.2 acres.
When was it filed?
The application was filed on 13 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Dec 2025 |
| Application filed | 13 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ravi Singh |
| Land area | 69.2 acres (28 ha) |
| Project cost | ₹8.4 crore |
| Village / locality | Kemda |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01319 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 69.2 acres, this one is smaller than 52% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 221.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Kemda, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project- Aurangabad Son 23-B Sand Ghat — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 31.60 Ha at Aurangabad Sone- 23C Sand… — lapsed, 250 m away
- Proposed Sand Mining Project of Area 31.60 Ha at Aurangabad Sone- 23C Sand… — cleared for impact study, 250 m away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — environmental approval granted, 350 m away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — cleared for impact study, 350 m away
- Proposed Sand Mining Project Aurangabad Sone-25-A on Sone River of District-… — cleared for impact study, 1.1 km away
- Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District-… — environmental approval granted, 1.3 km away
- Proposed Sand Mining Project Aurangabad Sone- 25-B on Sone River of District-… — cleared for impact study, 1.3 km away
More from Ravi Singh in Aurangabad
- Proposed Sand Mining Project- Aurangabad Son 23-B Sand Ghat — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.