Quick answers
What is this project?
3x660 MW Super-Critical Technology Coal Based Nabinagar Thermal Power Plant is a proposed power project in Chorahi, Nabinagar, Aurangabad, Bihar. The site covers 1,496.8 acres.
Who is building it?
The applicant is Nabinagar Power Generating Company Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Chorahi, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹19,142.5 crore and a site of 1,496.8 acres.
When was it filed?
The application was filed on 9 Dec 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 20 Mar 2025 |
| Application filed | 9 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Nabinagar Power Generating Company Limited |
| Land area | 1,496.8 acres (605.7 ha) |
| Project cost | ₹19,142.5 crore |
| Village / locality | Chorahi |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00775 |
In context
7 applications in Aurangabad since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chorahi, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nabinagar Super Thermal Power Station — withdrawn, 0 m away
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — more information requested, 50 m away
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — environmental approval granted, 50 m away
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — cleared for impact study, 50 m away
- Nabinagar Super Thermal Power Station — withdrawn, 100 m away
- Proposed Sand Mining Project of Area 60 Ha at Aurangabad Ghat 31 on Sone River… — cleared for impact study, 5.9 km away
- Proposed Sand Mining Project of Area 60 Ha at Aurangabad Ghat 31 on Sone River… — environmental approval granted, 5.9 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — environmental approval granted, 6.3 km away
More from Nabinagar Power Generating Company Limited in Aurangabad
- Nabinagar Super Thermal Power Station — withdrawn
- Nabinagar Super Thermal Power Station — withdrawn
All 3 Nabinagar Power Generating projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.