Quick answers
What is Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)?
Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) is a proposed power project in Kusumha, Nabinagar, Aurangabad, Bihar. The site covers 2,970.9 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kusumha, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹38,304.3 crore; a site of 2,970.9 acres and 18.3 acres (7.4 ha) of forest land.
When was it filed?
The application was filed on 3 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 3 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 2,970.9 acres (1,202.3 ha) |
| Forest land | 18.3 acres (7.4 ha) |
| Project cost | ₹38,304.3 crore |
| Village / locality | Kusumha |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03746 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 3 Sept 2025 (this page) | More information requested | 2,970.9 acres | ₹38,304.3 crore |
| Expansion filed 6 Feb 2025 | Environmental approval granted | 2,970.9 acres | ₹38,304.3 crore |
In context
7 applications in Aurangabad since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kusumha, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — environmental approval granted, 0 m away
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — cleared for impact study, 0 m away
- Nabinagar Super Thermal Power Station — withdrawn, 50 m away
- 3x660 MW Super-Critical Technology Coal Based Nabinagar Thermal Power Plant — returned to applicant, 50 m away
- Nabinagar Super Thermal Power Station — withdrawn, 50 m away
- Proposed Sand Mining Project of Area 60 Ha at Aurangabad Ghat 31 on Sone River… — cleared for impact study, 5.9 km away
- Proposed Sand Mining Project of Area 60 Ha at Aurangabad Ghat 31 on Sone River… — environmental approval granted, 5.9 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — environmental approval granted, 6.3 km away
More from NTPC Limited (NTPC) in Aurangabad
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — cleared for impact study
4 NTPC projects in Aurangabad
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.