Environmental approval grantedPower · Aurangabad, Bihar

Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)

Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) is an approved power project in Kusumha, Nabinagar, Aurangabad, Bihar. The site covers 2,970.9 acres. Its stated project cost is ₹38,304.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Feb 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)?

Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) is an approved power project in Kusumha, Nabinagar, Aurangabad, Bihar. The site covers 2,970.9 acres.

Who is building it?

The applicant is NTPC Limited (NTPC).

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Feb 2025), as of 27 Nov 2026.

Where is it?

In Kusumha, Nabinagar, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹38,304.3 crore and a site of 2,970.9 acres.

When was it filed?

The application was filed on 6 Feb 2025.

Project details

StatusEnvironmental approval granted
Status since28 Feb 2025
Application filed6 Feb 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorPower
ApplicantNTPC Limited (NTPC)
Land area2,970.9 acres (1,202.3 ha)
Project cost₹38,304.3 crore
Village / localityKusumha
Taluk / tehsilNabinagar
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01395

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 3 Sept 2025More information requested2,970.9 acres₹38,304.3 crore
Expansion filed 6 Feb 2025 (this page)Environmental approval granted2,970.9 acres₹38,304.3 crore

In context

7 applications in Aurangabad since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kusumha, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Aurangabad

4 NTPC projects in Aurangabad
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.