Quick answers
What is this project?
Proposed Sand Mining Project Aurangabad Sone- 22C on Sone River of District- Aurangabad, State- Bihar is an approved mining project in Gothauli, Barun, Aurangabad, Bihar. The site covers 81.3 acres.
Who is building it?
The applicant is Upendra Nikhil Hi Tech Constructions Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jul 2025), as of 27 Nov 2026.
Where is it?
In Gothauli, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10.1 crore and a site of 81.3 acres.
When was it filed?
The application was filed on 4 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jul 2025 |
| Application filed | 4 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Upendra Nikhil Hi Tech Constructions Private Limited |
| Land area | 81.3 acres (32.9 ha) |
| Project cost | ₹10.1 crore |
| Village / locality | Gothauli |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01420 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jun 2025 (this page) | Environmental approval granted | 81.3 acres | ₹10.1 crore |
| Early planning filed 18 May 2024 | Cleared for impact study | 81.3 acres | ₹10.1 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 81.3 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Gothauli, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Aurangabad Sone- 22C on Sone River of District-… — cleared for impact study, 0 m away
- Proposed Sand Mining Project Aurangabad Sone- 22-A on Sone River of District-… — cleared for impact study, 1.1 km away
- Sand Mining Project on Sone River at Aurangabad Ghat 21, of District -… — environmental approval granted, 2.7 km away
- Sand Mining Project on Sone River at Aurangabad Ghat 21, of District -… — cleared for impact study, 2.7 km away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — environmental approval granted, 3.6 km away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — cleared for impact study, 3.6 km away
- Proposed Sand Mining Project Aurangabad Sone- 20 A on Sone River of District-… — environmental approval granted, 3.8 km away
- Proposed Sand Mining Project Aurangabad Sone- 20 A on Sone River of District-… — cleared for impact study, 3.8 km away
More from Upendra Nikhil Hi Tech Constructions Private Limited in Aurangabad
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — environmental approval granted
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on… — cleared for impact study
All 4 Upendra Nikhil Hi projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.