What is Developing? Open the mapMap

Environmental approval grantedMining · Aurangabad, Bihar

Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on Sone River of District-Aurangabad State-Bihar.

Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on Sone River of District-Aurangabad State-Bihar is an approved mining project in Barun, Aurangabad, Bihar. The site covers 74.1 acres. Its stated project cost is ₹9.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Aug 2024).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone 23A Ghat on Sone River of District-Aurangabad State-Bihar is an approved mining project in Barun, Aurangabad, Bihar. The site covers 74.1 acres.

Who is building it?

The applicant is Upendra Nikhil Hi Tech Constructions Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.

Where is it?

In Barun, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹9.2 crore and a site of 74.1 acres.

When was it filed?

The application was filed on 4 Jul 2024.

Project details

StatusEnvironmental approval granted
Status since10 Aug 2024
Application filed4 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantUpendra Nikhil Hi Tech Constructions Private Limited
Land area74.1 acres (30 ha)
Project cost₹9.2 crore
Village / localityBarun
Taluk / tehsilBarun
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00634

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Jul 2024 (this page)Environmental approval granted74.1 acres₹9.2 crore
Early planning filed 30 Jan 2024Cleared for impact study74.1 acres₹9.2 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 74.1 acres, this one is larger than 54% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 143.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Upendra Nikhil Hi Tech Constructions Private Limited in Aurangabad

All 4 Upendra Nikhil Hi projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.