Quick answers
What is this project?
M/S K.R.S. Bricks Proposed Brick Clay Mining Project at Mauza- Parsurampur, Block- Pirpainti, District- Bhagalpur, Bihar is an approved mining project in Parasrampur G.P., Pirpainti, Bhagalpur, Bihar. The site covers 2.5 acres.
Who is building it?
The applicant is Mohammad Kamal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2026), as of 27 Nov 2026.
Where is it?
In Parasrampur G.P., Pirpainti, Bhagalpur, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 9 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 9 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mohammad Kamal |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Parasrampur G.P. |
| Taluk / tehsil | Pirpainti |
| District | Bhagalpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01636 |
In context
96 applications in Bhagalpur since January 2022 are in the same category (Mining): 80 approved, 15 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 2.5 acres, this one is smaller than 78% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Parasrampur G.P., Pirpainti, Bhagalpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Ram Swaroop Ceramics Marks - RSC Proposed Brick clay Mining Project at… — environmental approval granted, 2.1 km away
- M/S W. B. B. Bricks Proposed Brick Clay Mining Project at Mauza- Manikpur,… — environmental approval granted, 2.6 km away
- M/S K. B. B. Proposed Brick Clay Mining Project at Mauza- Khushalpur, Block-… — environmental approval granted, 3.3 km away
- M/S G S B Udyog Proposed Brick Clay Mining Project at Mauza- Harin Kol, Block-… — environmental approval granted, 4.3 km away
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — withdrawn, 4.4 km away
- Expansion of Pirpainti Thermal Power Plant from 2400(3x800) MW (Phase I) to… — under environmental review, 4.4 km away
- Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project… — environmental approval granted, 4.5 km away
- Proposed 2400 (3x800)MW Coal Based Ultra Super Critical Thermal Power Project… — cleared for impact study, 4.5 km away
More from Mohammad Kamal in Bhagalpur
- M/S K. B. B. Proposed Brick Clay Mining Project at Mauza- Khushalpur, Block-… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.