Quick answers
What is Brick Earth Mining Project of M/s Kumar Int Udyog?
Brick Earth Mining Project of M/s Kumar Int Udyog is an approved mining project in Baji Raut, Sakra, Muzaffarpur, Bihar. The site covers 2.6 acres.
Who is building it?
The applicant is Ram Babu Rai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Baji Raut, Sakra, Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 7 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 7 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Babu Rai |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Baji Raut |
| Taluk / tehsil | Sakra |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01759 |
In context
72 applications in Muzaffarpur since January 2022 are in the same category (Mining): 51 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Baji Raut, Sakra, Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining Project of M/s Bemishal Int Udyog — environmental approval granted, 1.8 km away
- Soil/Ordinary Earth Mining (Area-1.108 ha/2.740 Acres) — lapsed, 6.9 km away
- Proposed brick earth mining project of M/s Mahal bricks located at Mauza –… — environmental approval granted, 6.9 km away
- Proposed brick earth mining project located at Mauza – Mahamadpur Alam, Block-… — environmental approval granted, 7.8 km away
- Retail out-let dealership of M/s KRRISHAY BIOFUEL PVT Ltd. Location… — initial checks, 8.1 km away
- M/S S.S COMPANY for Brick Soil Mining — environmental approval granted, 8.3 km away
- Brick Earth Mining project of M/s P.K.S. Bricks at Mauza- Titra Bishanpur,… — under environmental review, 9.7 km away
- Diversion of 0.01065 Ha of Forest Land for Construction of Approach Road for… — lapsed, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.