Quick answers
What is Soil/Ordinary Earth Mining (Area-1.108 ha/2.740 Acres)?
Soil/Ordinary Earth Mining (Area-1.108 ha/2.740 Acres) is a lapsed mining project in Hasanpur Baghi, Sakra, Muzaffarpur, Bihar. The site covers 2.7 acres.
Who is building it?
The applicant is BROADway links Private limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Hasanpur Baghi, Sakra, Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 19 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 19 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | BROADway links Private limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Hasanpur Baghi |
| Taluk / tehsil | Sakra |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00675 |
In context
72 applications in Muzaffarpur since January 2022 are in the same category (Mining): 51 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 85% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Hasanpur Baghi, Sakra, Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.01065 Ha of Forest Land for Construction of Approach Road for… — lapsed, 3.2 km away
- Diversion of 0.014625 Ha of Forest Land for Construction of Approach Road for… — lapsed, 5.4 km away
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — more information requested, 5.5 km away
- Brick Earth Mining project of M/s P.K.S. Bricks at Mauza- Titra Bishanpur,… — under environmental review, 6 km away
- Proposed Brick clay mining project at Mauja- Piar urf Bisanpur, Block- Bandra,… — initial checks, 6 km away
- Brick Earth Mining Project of M/s Kumar Int Udyog — environmental approval granted, 6.9 km away
- Brick Earth Mining Project of M/s Bemishal Int Udyog — environmental approval granted, 8.6 km away
- Diversion of 0.0285 ha of forest land for construction of approach road for… — lapsed, 11.6 km away
All 3 BROADway links projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.