Quick answers
What is this project?
Brick Earth Mining project of M/s P.K.S. Bricks at Mauza- Titra Bishanpur, Block- Moraul, District- Muzaffarpur, Bihar (Lease Area: 1.43 Ha.) is a proposed mining project in Bishunpur Titra, Dholi (Moraul), Muzaffarpur, Bihar. The site covers 3.5 acres.
Who is building it?
The applicant is Pks Bricks.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bishunpur Titra, Dholi (Moraul), Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 5 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 5 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pks Bricks |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Bishunpur Titra |
| Taluk / tehsil | Dholi (Moraul) |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-04060 |
In context
72 applications in Muzaffarpur since January 2022 are in the same category (Mining): 51 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.5 acres, this one is smaller than 64% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bishunpur Titra, Dholi (Moraul), Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — more information requested, 2.9 km away
- Diversion of 0.014625 Ha of Forest Land for Construction of Approach Road for… — lapsed, 2.9 km away
- Diversion of 0.01065 Ha of Forest Land for Construction of Approach Road for… — lapsed, 5.7 km away
- Soil/Ordinary Earth Mining (Area-1.108 ha/2.740 Acres) — lapsed, 6 km away
- Proposed Brick clay mining project at Mauja- Piar urf Bisanpur, Block- Bandra,… — initial checks, 6.1 km away
- Diversion of 0.0285 ha of forest land for construction of approach road for… — lapsed, 7.5 km away
- Sand Mining on Muraul sand ghat (extent 6.0 Ha) and Baidnathpur sand ghat… — cleared for impact study, 9.3 km away
- Brick Earth Mining Project of M/s Kumar Int Udyog — environmental approval granted, 9.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.