Quick answers
What is this project?
Sand Mining Project Sand Block Bhoj Son-30A Sand Ghat located at Mouza- Peur Chak, Block- Sahar, District- Bhojpur, Bihar is an approved mining project in Peur, Sahar, Bhojpur, Bihar. The site covers 81.5 acres.
Who is building it?
The applicant is Loukush Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2026), as of 27 Nov 2026.
Where is it?
In Peur, Sahar, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹10.9 crore and a site of 81.5 acres.
When was it filed?
The application was filed on 11 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2026 |
| Application filed | 11 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Loukush Kumar |
| Land area | 81.5 acres (33 ha) |
| Project cost | ₹10.9 crore |
| Village / locality | Peur |
| Taluk / tehsil | Sahar |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01164 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Dec 2025 (this page) | Environmental approval granted | 81.5 acres | ₹10.9 crore |
| Early planning filed 18 Jun 2025 | Cleared for impact study | 81.5 acres | ₹10.9 crore |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 81.5 acres, this one is larger than 55% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 375.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Peur, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project Sand Block Bhoj Son-30A Sand Ghat located at Mouza- Peur… — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 26.0 Ha at BHOJ SON- 29C on Sone River of… — environmental approval granted, 250 m away
- Proposed Sand Mining Project of Area 26.0 Ha at BHOJ SON- 29C on Sone River of… — cleared for impact study, 250 m away
- Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30B on Sone River of… — environmental approval granted, 250 m away
- Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30B on Sone River of… — cleared for impact study, 250 m away
- Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of… — environmental approval granted, 500 m away
- Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of… — cleared for impact study, 500 m away
- Proposed Sand Mining Project of Area 27.0 Ha at BHOJ SON- 29B on Sone River of… — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.