What is Developing? Open the mapMap

Environmental approval grantedMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 26.0 Ha at BHOJ SON- 29C on Sone River of District- Bhojpur, State- Bihar

Proposed Sand Mining Project of Area 26.0 Ha at BHOJ SON- 29C on Sone River of District- Bhojpur, State- Bihar is an approved mining project in Peur, Sahar, Bhojpur, Bihar. The site covers 64.2 acres. Its stated project cost is ₹8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Feb 2026).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 26.0 Ha at BHOJ SON- 29C on Sone River of District- Bhojpur, State- Bihar is an approved mining project in Peur, Sahar, Bhojpur, Bihar. The site covers 64.2 acres.

Who is building it?

The applicant is A2bs Infrastructures and Consultants Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Feb 2026), as of 27 Nov 2026.

Where is it?

In Peur, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹8 crore and a site of 64.2 acres.

When was it filed?

The application was filed on 20 Jan 2026.

Project details

StatusEnvironmental approval granted
Status since26 Feb 2026
Application filed20 Jan 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantA2bs Infrastructures and Consultants Private Limited
Land area64.2 acres (26 ha)
Project cost₹8 crore
Village / localityPeur
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02297

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jan 2026 (this page)Environmental approval granted64.2 acres₹8 crore
Early planning filed 2 Aug 2025Cleared for impact study64.2 acres₹8 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 64.2 acres, this one is smaller than 59% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 294.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Peur, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.