Quick answers
What is this project?
Proposed 50 TPH PPC/OPC Cement Grinding Unit based on Closed-Circuit Ball Mill Technology at Kanti, Muzaffarpur, Bihar is a proposed industrial project in Kanti, Musahri, Muzaffarpur, Bihar. The site covers 5.8 acres.
Who is building it?
The applicant is Sumukh Saurabh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kanti, Musahri, Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹29.9 crore and a site of 5.8 acres.
When was it filed?
The application was filed on 28 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 28 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sumukh Saurabh |
| Land area | 5.8 acres (2.4 ha) |
| Project cost | ₹29.9 crore |
| Village / locality | Kanti |
| Taluk / tehsil | Musahri |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02674 |
In context
11 applications in Muzaffarpur since January 2022 are in the same category (Industry): 10 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.8 acres, this one is smaller than 55% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanti, Musahri, Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2x195 MW (Stage-ll) Coal Based Thermal Power Plant by NTPC — lapsed, 2.8 km away
- M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal… — environmental approval granted, 2.8 km away
- M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal… — withdrawn, 2.8 km away
- Industrial project by Maa Bhagwati Sponge Iron PVT. LTD. — cleared for impact study, 5.4 km away
- Proposed "Mustafapur Soil mining Project" at Mauza + P.O- Mustafapur, P.S –… — environmental approval granted, 6.3 km away
- Sand Mining Project on Sand Ghat/ Unit No.-08 (Kharar Ghat-03) on Burhi Gandak… — environmental approval granted, 6.4 km away
- Sand Mining Project on Sand Ghat/ Unit No.-08 (Kharar Ghat-03) on Burhi Gandak… — cleared for impact study, 6.4 km away
- Sand Mining Project at Sand Ghat/Unit No. - 06 (Kharhar Ghat - 01) on Burhi… — environmental approval granted, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.