Quick answers
What is this project?
M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal Power Plant is an approved power project in Akurahan Khargi, Musahri, Muzaffarpur, Bihar. The site covers 1,237.7 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.
Where is it?
In Akurahan Khargi, Musahri, Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹4,778.7 crore and a site of 1,237.7 acres.
When was it filed?
The application was filed on 7 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Aug 2024 |
| Application filed | 7 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 1,237.7 acres (500.9 ha) |
| Project cost | ₹4,778.7 crore |
| Village / locality | Akurahan Khargi |
| Taluk / tehsil | Musahri |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00574 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akurahan Khargi, Musahri, Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal… — withdrawn, 0 m away
- 2x195 MW (Stage-ll) Coal Based Thermal Power Plant by NTPC — lapsed, 50 m away
- Proposed 50 TPH PPC/OPC Cement Grinding Unit based on Closed-Circuit Ball Mill… — under environmental review, 2.8 km away
- Industrial project by Maa Bhagwati Sponge Iron PVT. LTD. — cleared for impact study, 3 km away
- Brick Earth Mining Project of M/s Shakti Bricks — environmental approval granted, 5.4 km away
- Sand Mining Project on Sand Ghat/ Unit No.-08 (Kharar Ghat-03) on Burhi Gandak… — environmental approval granted, 5.9 km away
- Sand Mining Project on Sand Ghat/ Unit No.-08 (Kharar Ghat-03) on Burhi Gandak… — cleared for impact study, 5.9 km away
- Sand Ghat/Unit No.- 04 (Ghosaut Sand Ghat-01A) on Burhi Gandak river of… — cleared for impact study, 6.1 km away
More from NTPC Limited (NTPC) in Muzaffarpur
- 2x195 MW (Stage-ll) Coal Based Thermal Power Plant by NTPC — lapsed
- M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal… — withdrawn
3 NTPC projects in Muzaffarpur
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.