Quick answers
What is this project?
Diversion of 0.0342 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Reliance Bp Mobility Ltd's on Khata No.-2980, Plot No.-6526, Thana No.-98, Mauza-Babura, Anchal-Barhara to Koilwar-Chapra Mdr Road is a proposed fuel station in Babura Gp, Barhara, Bhojpur, Bihar. The site covers 0.8 acres.
Who is building it?
The applicant is Reliance Bp Mobility Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Babura Gp, Barhara, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.8 acres and 340 m² of forest land.
When was it filed?
The application was filed on 26 Mar 2026.
Project details
| Official title | Diversion of 0.0342 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Reliance Bp Mobility Ltd's on Khata No.-2980, Plot No.-6526, Thana No.-98, Mauza-Babura, Anchal-Barhara to Koilwar-Chapra Mdr Road in Bhojpur District of Bihar. |
|---|---|
| Status | More information requested |
| Status since | 12 Nov 2026 |
| Application filed | 26 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliance Bp Mobility Limited |
| Land area | 3,200 m² |
| Forest land | 340 m² |
| Project cost | ₹80 lakh |
| Village / locality | Babura Gp |
| Taluk / tehsil | Barhara |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03040 |
In context
28 applications in Bhojpur since January 2022 are in the same category (Fuel stations): 17 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.8 acres, this one is larger than 89% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babura Gp, Barhara, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S RAM BRICKS - Babura Soil Brick Mining… — environmental approval granted, 1.2 km away
- Diversion of 0.0165 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 1.6 km away
- Diversion of 0.02175 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 1.8 km away
- W/S work for 4 Lane to 6 Lane in KM 0.00 to 20.40 KM of Ara (NH-30) to… — lapsed, 3.4 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 01 on Sone River of… — environmental approval granted, 4.9 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of… — environmental approval granted, 4.9 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of… — cleared for impact study, 4.9 km away
- Proposed Sand Mining Project of Area 12 Ha at Bhojpur Ghat 2 on Sone River of… — cleared for impact study, 6.2 km away
All 153 Reliance Bp Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.