Quick answers
What is this project?
Diversion of 0.014625 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Indian Oil Corporation LTD. on Khata No.-7, Khesra No.-701, Thana No.-874, Mauza-Pilkhi Gajpatti, Thana-Sakra to Muzaffarpur-Pusa Road is a lapsed fuel station in Pilkhi Gajpatti, Dholi (Moraul), Muzaffarpur, Bihar. The site covers 0.5 acres.
Who is building it?
The applicant is Ram Prasad Mahto.
Has it been approved?
No. The application was lapsed on 23 Feb 2026, so it is no longer under consideration.
Where is it?
In Pilkhi Gajpatti, Dholi (Moraul), Muzaffarpur, Bihar.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.5 acres and 150 m² of forest land.
When was it filed?
The application was filed on 10 Jan 2026.
Project details
| Official title | Diversion of 0.014625 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Indian Oil Corporation LTD. on Khata No.-7, Khesra No.-701, Thana No.-874, Mauza-Pilkhi Gajpatti, Thana-Sakra to Muzaffarpur-Pusa Road in Muzaffarpur District of Bihar. |
|---|---|
| Status | Lapsed |
| Status since | 23 Feb 2026 |
| Application filed | 10 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Ram Prasad Mahto |
| Land area | 1,900 m² |
| Forest land | 150 m² |
| Project cost | ₹80 lakh |
| Village / locality | Pilkhi Gajpatti |
| Taluk / tehsil | Dholi (Moraul) |
| District | Muzaffarpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03596 |
In context
16 applications in Muzaffarpur since January 2022 are in the same category (Fuel stations): 3 approved, 7 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 81% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pilkhi Gajpatti, Dholi (Moraul), Muzaffarpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — more information requested, 100 m away
- Brick Earth Mining project of M/s P.K.S. Bricks at Mauza- Titra Bishanpur,… — under environmental review, 2.9 km away
- Proposed Brick clay mining project at Mauja- Piar urf Bisanpur, Block- Bandra,… — initial checks, 3.2 km away
- Diversion of 0.01065 Ha of Forest Land for Construction of Approach Road for… — lapsed, 3.6 km away
- Soil/Ordinary Earth Mining (Area-1.108 ha/2.740 Acres) — lapsed, 5.4 km away
- Sand Mining on Muraul sand ghat (extent 6.0 Ha) and Baidnathpur sand ghat… — cleared for impact study, 7.6 km away
- Diversion of 0.0225 Ha of Forest Land for Construction of Approach Road for… — more information requested, 10.1 km away
- Diversion of 0.0285 ha of forest land for construction of approach road for… — lapsed, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.