One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat Limited…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Nov 2022 |
| Application filed | 28 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Godawari Power and Ispat Limited |
| Land area | 533.6 acres (216 ha) |
| Project cost | ₹278.9 crore |
| Village / locality | Kachche R F |
| Taluk / tehsil | Bhanupratappur |
| District | Uttar Bastar Kanker |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00006 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Dec 2025 | Environmental approval granted | 533.6 acres | ₹278.9 crore |
| Amendment filed 8 Oct 2025 | Cleared for impact study | 526.4 acres | ₹278.9 crore |
| Early planning filed 28 Nov 2022 (this page) | Cleared for impact study | 533.6 acres | ₹278.9 crore |
In context
71 applications in Uttar Bastar Kanker since January 2022 are in the same category (Mining): 40 approved, 13 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 533.6 acres, this one is larger than 90% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kachche R F, Bhanupratappur, Uttar Bastar Kanker, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — environmental approval granted, 0 m away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 0 m away
- Proposed Enhancement in Feed capacity of existing Low Grade Iron Ore (BMQ)… — initial checks, 50 m away
- Expansion in Production of Kache Aridongri Iron Ore Mine — under environmental review, 1.5 km away
- Kalwar Iron Ore Block — under environmental review, 8.1 km away
- Kalwar Iron Ore Block — cleared for impact study, 8.1 km away
- Proposed Expansion of Kalwar-Nagur Iron Ore Mine (20% in first phase from 1.0… — under environmental review, 9.6 km away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved, 9.6 km away
More from Godawari Power and Ispat Limited in Uttar Bastar Kanker
4 Godawari Power and Ispat projects in Uttar Bastar Kanker
All 13 Godawari Power and Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.