Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Jun 2023 |
| Application filed | 21 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Harshit Agrawal |
| Land area | 58.6 acres (23.7 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Kalwar |
| Taluk / tehsil | Durgkondal |
| District | Uttar Bastar Kanker |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00235 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Feb 2025 | Under environmental review | 58.6 acres | ₹75 lakh |
| Early planning filed 21 Jun 2023 (this page) | Cleared for impact study | 58.6 acres | ₹75 lakh |
In context
71 applications in Uttar Bastar Kanker since January 2022 are in the same category (Mining): 40 approved, 13 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 58.6 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kalwar, Durgkondal, Uttar Bastar Kanker, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalwar Iron Ore Block — under environmental review, 0 m away
- Proposed Expansion of Kalwar-Nagur Iron Ore Mine (20% in first phase from 1.0… — under environmental review, 1.5 km away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved, 1.5 km away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — lapsed, 1.5 km away
- Drilling of 23 Nos of 4" Dia Bore Hole for Prospecting in Un-Diverted Forest… — forest land use approved, 1.5 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — environmental approval granted, 8.1 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 8.1 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.