Project details
| Status | Under environmental review |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 15 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Steel Authority of India LTD |
| Land area | 2,318 acres (938.1 ha) |
| Project cost | ₹62.3 crore |
| Village / locality | Naghur |
| Taluk / tehsil | Durgkondal |
| District | Uttar Bastar Kanker |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03575 |
In context
71 applications in Uttar Bastar Kanker since January 2022 are in the same category (Mining): 40 approved, 13 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2,318 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Naghur, Durgkondal, Uttar Bastar Kanker, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved, 0 m away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — lapsed, 0 m away
- Drilling of 23 Nos of 4" Dia Bore Hole for Prospecting in Un-Diverted Forest… — forest land use approved, 0 m away
- Kalwar Iron Ore Block — under environmental review, 1.5 km away
- Kalwar Iron Ore Block — cleared for impact study, 1.5 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — environmental approval granted, 9.6 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 9.6 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 9.6 km away
More from Steel Authority of India LTD in Uttar Bastar Kanker
- Drilling of 62 Nos of Exploratory Bore Hole Upto 6" Diameter in Compartment No… — forest land use approved
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — lapsed
- Amendment in Ec Dated 04.06.2009 of Rowghat Iron Ore Mine Deposit-F for… — environmental approval granted
- Drilling of 23 Nos of 4" Dia Bore Hole for Prospecting in Un-Diverted Forest… — forest land use approved
- Forest Land Convirsion proposel for Construction of School and Hospital under… — lapsed
8 Steel Authority of India projects in Uttar Bastar Kanker
All 51 Steel Authority of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.