Quick answers
What is this project?
Greenfield Project of 60 KLPD Grain Based Ethanol Plant by Shri. Sanjay Gupta and Others is an approved industrial project in Biladi, Tilda, Raipur, Chhattisgarh. The site covers 14 acres.
Who is building it?
The applicant is Sanjay Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Mar 2023), as of 27 Nov 2026.
Where is it?
In Biladi, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹86.4 crore and a site of 14 acres.
When was it filed?
The application was filed on 28 Mar 2023.
Project details
| Official title | Greenfield Project of 60 KLPD Grain Based Ethanol Plant along with 2 MW Co-generation Power Plant located at Khasra No. 189/4, 189/13, Village- Biladi, Tehsil- Tilda, District-Raipur, Chhattisgarh by Shri. Sanjay Gupta and Others. |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Mar 2023 |
| Application filed | 28 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sanjay Gupta |
| Land area | 14 acres (5.7 ha) |
| Project cost | ₹86.4 crore |
| Village / locality | Biladi |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00601 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14 acres, this one is smaller than 57% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Biladi, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 1.5 km away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 1.5 km away
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 1.5 km away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 1.7 km away
- Biladi Low Grade Limestone Quarry — environmental approval granted, 2.1 km away
- Nikunj Patel — lapsed, 2.1 km away
- Biladi Limestone Quarry — withdrawn, 2.1 km away
- For proposed "Change in Furnaces configuration from (8 x 15 MT, 2 x 15 MT –… — initial checks, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.