Project details
| Official title | Expansion in Production Capacity from 5.5 MTPA ROM to 9.00 MTPA ROM (Maximum Total Excavation 10.31 MTPA) along with Existing Crusher and Wobbler with Capacity of 1200 TPH & 300 TPH and New Installation of Additional Crusher and Wobbler with Capacity of 1200 TPH & 300 TPH & Limestone Recovery System (Washery) Plant 450 TPHx2=900 TPH (ML Area- 395.05 ha) |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Nov 2022 |
| Application filed | 5 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Nu Vista Limited |
| Land area | 976.2 acres (395.1 ha) |
| Project cost | ₹145.7 crore |
| Village / locality | Bharseli Malgujari |
| Taluk / tehsil | Baloda Bazar |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-00065 |
In context
181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 976.2 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Bharseli Malgujari, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — environmental approval granted, 650 m away
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — cleared for impact study, 650 m away
- Enhancement in production of Cement Mill from 3.0 MTPA to 3.5 MTPA through… — initial checks, 1.8 km away
- Request for Change of Name from M/s Ambuja Cement Eastern Limited to M/s… — lapsed, 2.9 km away
- Mining project by M/s. Verma Material Suppliers — more information requested, 3.2 km away
- Mudhipar Lime Stone Quarry Project — cleared for impact study, 3.2 km away
- Mudhipar Limestone Quarry (Rakesh Verma) — environmental approval granted, 3.3 km away
- Rakesh Verma Limestone Quarry Mudipar — cleared for impact study, 3.3 km away
More from M/S Nu Vista Limited in Baloda Bazar
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — environmental approval granted
- Enhancement in production of Cement Mill from 3.0 MTPA to 3.5 MTPA through… — initial checks
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — cleared for impact study
4 Nu Vista projects in Baloda Bazar
All 11 Nu Vista projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.