Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 31 Jan 2023 |
| Application filed | 31 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Tiwarta Coal Beneficiation Limited |
| Land area | 19.9 acres (8.1 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Limha |
| Taluk / tehsil | Bilaspur |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00088 |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.9 acres, this one is smaller than 85% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Limha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Tiwarta Coal Beneficiation Limited — environmental approval granted, 0 m away
- Preliminary Exploration for Gold and Associated Mineralization in the… — lapsed, 2.5 km away
- Drilling of 44 Nos. Boreholes of 3 Inch Dia. in 17.65 Sq Km for Proposed… — more information requested, 9.7 km away
- Bilaspur Pumped Storage Project (1000 MW) — lapsed, 10.2 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 10.4 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 10.4 km away
- Nutan Chandra — environmental approval granted, 12.8 km away
- Nutan Chandra — lapsed, 12.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.