Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 24 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Ashok Kumar Dhulyani |
| Land area | 19.9 acres (8.1 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Limha |
| Taluk / tehsil | Bilaspur |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03598 |
In context
180 applications in Bilaspur since January 2022 are in the same category (Mining): 90 approved, 21 filed or under review, and 69 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 19.9 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Limha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Tiwarta Coal Benefication Limited — cleared for impact study, 0 m away
- Preliminary Exploration for Gold and Associated Mineralization in the… — lapsed, 2.5 km away
- Drilling of 44 Nos. Boreholes of 3 Inch Dia. in 17.65 Sq Km for Proposed… — more information requested, 9.7 km away
- Bilaspur Pumped Storage Project (1000 MW) — lapsed, 10.2 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 10.4 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 10.4 km away
- Nutan Chandra — environmental approval granted, 12.8 km away
- Nutan Chandra — lapsed, 12.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.