What is Developing? Open the mapMap

Returned to applicantIndustry · Raigarh, Chhattisgarh

Expansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron

Expansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron is a proposed industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 28.4 acres. Its stated project cost is ₹365 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 18 Jul 2024).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron is a proposed industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 28.4 acres.

Who is building it?

The applicant is Shambhavi Ispat.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Gerwani, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹365 crore and a site of 28.4 acres.

When was it filed?

The application was filed on 20 Dec 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Steel Plant by Backward Integration of steel plant comprising of…

Project details

Official titleExpansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron along with 2 x 10 MW WHRB Power Plant, 1 x 10 MW FBC Power Plant, 1 x 9 MVA Ferro Alloys Unit to manufacture FeSi - 7,000 TPA / FeMn - 25,200 TPA/ SiMn - 14,000 TPA / FeCr - 15,000 TPA / Pig Iron - 25,200 TPA, Briquetting Plant - 100 Kg/Hr., Brick Manufacturing unit (25,000 Bricks/day) & Slag Crushing Unit (40,000 TPA)
StatusReturned to applicant
Status since18 Jul 2024
Application filed20 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShambhavi Ispat
Land area28.4 acres (11.5 ha)
Project cost₹365 crore
Village / localityGerwani
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00102

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 13 Jul 2024Cleared for impact study25.7 acres₹369 crore
Early planning filed 20 Dec 2023 (this page)Returned to applicant28.4 acres₹365 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 28.4 acres, this one is smaller than 72% of them.

43 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gerwani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.