Quick answers
What is this project?
Expansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron is a proposed industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 25.7 acres.
Who is building it?
The applicant is Shambhavi Ispat.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Sept 2024), as of 27 Nov 2026.
Where is it?
In Gerwani, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹369 crore and a site of 25.7 acres.
When was it filed?
The application was filed on 13 Jul 2024.
Project details
| Official title | Expansion of Steel Plant by Backward Integration of steel plant comprising of establishment of 2 x 350 TPD DRI Kilns to manufacture 2,31,000 TPA of Sponge Iron along with 2 x 10 MW WHRB Power Plant, 1 x 10 MW FBC Power Plant, 1 x 9 MVA Ferro Alloys Unit to manufacture FeSi - 7,000 TPA / FeMn - 25,200 TPA/ SiMn - 14,000 TPA / FeCr - 15,000 TPA / Pig Iron - 25,200 TPA, Briquetting Plant - 100 Kg/Hr., Brick Manufacturing unit (25,000 Bricks/day) & Slag Crushing Unit (40,000 TPA) |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 Sept 2024 |
| Application filed | 13 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shambhavi Ispat |
| Land area | 25.7 acres (10.4 ha) |
| Project cost | ₹369 crore |
| Village / locality | Gerwani |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01473 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 13 Jul 2024 (this page) | Cleared for impact study | 25.7 acres | ₹369 crore |
| Early planning filed 20 Dec 2023 | Returned to applicant | 28.4 acres | ₹365 crore |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 25.7 acres, this one is smaller than 73% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gerwani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of TOR letter from Shambhavi Ispat to Shambhavi Ispat Pvt. Ltd. for… — cleared for impact study, 0 m away
- Expansion of Steel Plant by Backward Integration of steel plant comprising of… — returned to applicant, 0 m away
- Transfer of Environment Clearance (EC) of M/s. Shambhavi Ispat to M/s/.… — environmental approval granted, 50 m away
- Transfer of Environment Clearance (EC) of M/s. Shambhavi Ispat to M/s/.… — lapsed, 50 m away
- Diversion of Revenue Forest Land in Villages Chiraipani and Gerwani, Range… — not approved, 450 m away
- Request for issue of Amendments to the Environmental Clearance (EC) issued to… — more information requested, 550 m away
- Transfer of Environment Clearance from M/s. Salasar Steel and Power Ltd. to… — under environmental review, 550 m away
- Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with… — environmental approval granted, 550 m away