Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron 60000 TPA and expansion MS Billet/Ingot & Rerolled Products through IF with CCM & Rolling Mill from 57800 TPA to 250000 TPA; Installation of Billet RF (Coal Gasifier) based – 30000 TPA, SiMn – 9000 TPA and CPP 14 MW (Existing WHRB - 6 MW & AFBC - 2MW) and new Biomass Based 6 MW by M/s. Rama Udyog Private Limited At Siltara Industrial Growth Center Phase-II, Village-Siltara, Tahsil-Dharsiwa, District-Raipur 493111 C.G.

Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron 60000 TPA and expansion MS Billet/Ingot & Rerolled Products through IF with CCM & Rolling Mill from 57800 TPA to 250000 TPA; Installation of Billet RF (Coal Gasifier) based – 30000 TPA, SiMn – 9000 TPA and CPP 14 MW (Existing WHRB - 6 MW & AFBC - 2MW) and new Biomass Based 6 MW by M/s. Rama Udyog Private Limited At Siltara Industrial Growth Center Phase-II, Village-Siltara, Tahsil-Dharsiwa, District-Raipur 493111 C.G is a proposed industrial project in Siltara, Raipur, Chhattisgarh. The site covers 35.1 acres. Its stated project cost is ₹201 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Mar 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron 60000 TPA and expansion MS Billet/Ingot & Rerolled Products through IF with CCM & Rolling Mill from 57800 TPA to 250000 TPA; Installation of Billet RF (Coal Gasifier) based – 30000 TPA, SiMn – 9000 TPA and CPP 14 MW (Existing WHRB - 6 MW & AFBC - 2MW) and new Biomass Based 6 MW by M/s. Rama Udyog Private Limited At Siltara Industrial Growth Center Phase-II, Village-Siltara, Tahsil-Dharsiwa, District-Raipur 493111 C.G is a proposed industrial project in Siltara, Raipur, Chhattisgarh. The site covers 35.1 acres.

Who is building it?

The applicant is Rama Udyog Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 7 Mar 2024), as of 27 Nov 2026.

Where is it?

In Siltara, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹201 crore and a site of 35.1 acres.

When was it filed?

The application was filed on 11 Jan 2024.

Project details

StatusCleared for impact study
Status since7 Mar 2024
Application filed11 Jan 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRama Udyog Private Limited
Land area35.1 acres (14.2 ha)
Project cost₹201 crore
Village / localitySiltara
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00214

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 3 Sept 2025Lapsed35.1 acres₹201 crore
Early planning filed 11 Jan 2024 (this page)Cleared for impact study35.1 acres₹201 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35.1 acres, this one is larger than 57% of them.

61 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.