Quick answers
What is this project?
Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron 60000 TPA and expansion MS Billet/Ingot & Rerolled Products through IF with CCM & Rolling Mill from 57800 TPA to 250000 TPA; Installation of Billet RF (Coal Gasifier) based – 30000 TPA, SiMn – 9000 TPA and CPP 14 MW (Existing WHRB - 6 MW & AFBC - 2MW) and new Biomass Based 6 MW by M/s. Rama Udyog Private Limited At Siltara Industrial Growth Center Phase-II, Village-Siltara, Tahsil-Dharsiwa, District-Raipur 493111 C.G is a proposed industrial project in Siltara, Raipur, Chhattisgarh. The site covers 35.1 acres.
Who is building it?
The applicant is Rama Udyog Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Mar 2024), as of 27 Nov 2026.
Where is it?
In Siltara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹201 crore and a site of 35.1 acres.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Mar 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rama Udyog Private Limited |
| Land area | 35.1 acres (14.2 ha) |
| Project cost | ₹201 crore |
| Village / locality | Siltara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00214 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Sept 2025 | Lapsed | 35.1 acres | ₹201 crore |
| Early planning filed 11 Jan 2024 (this page) | Cleared for impact study | 35.1 acres | ₹201 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35.1 acres, this one is larger than 57% of them.
61 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron… — lapsed, 0 m away
- Transfer for Environment Clearance due to change in ownership from Rashmi… — more information requested, 350 m away
- Industrial project by Sarwottam Strips PVT. LTD. — environmental approval granted, 500 m away
- Expansion of Re-rolled Products through Rolling mill by hot charging from… — environmental approval granted, 700 m away
- M/s Sunil Sponge Pvt. Ltd.( Rolling Mill Division Unit-II) Plot No. 94, 95… — lapsed, 850 m away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 900 m away
- Expansion of production facilities of Induction Furnace with CCM from existing… — lapsed, 1.1 km away
- Expansion of production facilities of Induction Furnace with CCM from existing… — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.