Quick answers
What is this project?
Proposed Dyes and Dye Intermediate Manufacturing with production capacity of Solvent Black 5- 400 TPA; Acid Black 2- 1500 TPA; Basic dye (Basic Green -1, Basic Green -4, Basic Blue -9, Basic Yellow -2) – 200 TPA & by product Calcium Sulfate- 614 TPA is a proposed industrial project in Sondra, Raipur, Chhattisgarh. The site covers 8.3 acres.
Who is building it?
The applicant is Shriram Organic Industries Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Oct 2025), as of 27 Nov 2026.
Where is it?
In Sondra, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹8.8 crore and a site of 8.3 acres.
When was it filed?
The application was filed on 29 Sept 2025.
Project details
| Official title | Proposed Dyes and Dye Intermediate Manufacturing with production capacity of Solvent Black 5- 400 TPA; Acid Black 2- 1500 TPA; Basic dye (Basic Green -1, Basic Green -4, Basic Blue -9, Basic Yellow -2) – 200 TPA & by product Calcium Sulfate- 614 TPA located at Village -Sondra, Tehsil- Dharsiwa, District- Raipur, Chhattisgarh |
|---|---|
| Status | Cleared for impact study |
| Status since | 5 Oct 2025 |
| Application filed | 29 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shriram Organic Industries Private Limited |
| Land area | 8.3 acres (3.4 ha) |
| Project cost | ₹8.8 crore |
| Village / locality | Sondra |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02624 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.3 acres, this one is smaller than 64% of them.
62 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sondra, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Name Due to Change in Constitution From Partnership Firm to Company,… — environmental approval granted, 450 m away
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — environmental approval granted, 500 m away
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — cleared for impact study, 500 m away
- Industrial project by Mahavir Iron & Steel Pvt. Ltd. — cleared for impact study, 600 m away
- Transfer of Environmental clearance (EC) from M/s SKS Ispat Limited to M/s SKS… — under environmental review, 650 m away
- "Expansion of Integrated Steel Plant" by M/s SKS Ispat and Power Limited — lapsed, 700 m away
- M/s Sunil Sponge Pvt. Ltd.( Rolling Mill Division Unit-II) Plot No. 94, 95… — lapsed, 750 m away
- Shri Mahavir Iron & Steel Pvt. Ltd. (Unit – II) — lapsed, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.