Quick answers
What is 210 KLD Grain based Ethanol plant with ZLD?
210 KLD Grain based Ethanol plant with ZLD is a lapsed industrial project in Bhilai, Arang, Raipur, Chhattisgarh. The site covers 20.9 acres.
Who is building it?
The applicant is Modi Biotech Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Bhilai, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹192 crore and a site of 20.9 acres.
When was it filed?
The application was filed on 4 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 210 KLD Grain based Ethanol plant with ZLD
Project details
| Official title | 210 KLD Grain based Ethanol plant with ZLD along with 5.0 MW Captive Power Plant under EBP Programme, at Village Bhilai, Tehsil: Arang, District Raipur, Chhattisgarh |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 4 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Modi Biotech Private Limited |
| Land area | 20.9 acres (8.5 ha) |
| Project cost | ₹192 crore |
| Village / locality | Bhilai |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00247 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 2 Sept 2024 | Environmental approval granted | 20.5 acres | ₹192 crore |
| Amendment filed 4 Jul 2023 (this page) | Lapsed | 20.9 acres | ₹192 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.9 acres, this one is smaller than 53% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhilai, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 210 KLD Grain based Ethanol plant with ZLD — environmental approval granted, 0 m away
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved, 0 m away
- No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From… — initial checks, 0 m away
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — environmental approval granted, 50 m away
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — cleared for impact study, 50 m away
- LIMESTONE (FLAGGY) QUARRY, VILLAGGE NISDA AREA 0.85 Ha PROJECT PROPONENT SHRI… — lapsed, 6.2 km away
- Flagstone Quarry, Village Nisda, Area 0.68 ha Project Proponent Naresh Ashani — lapsed, 6.2 km away
- Ms Nisda Lmestone (Flaggy Limestone)quarry, Village Nisda, Area 0.90 Acre… — lapsed, 6.3 km away
More from Modi Biotech Private Limited in Raipur
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — environmental approval granted
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — cleared for impact study
- No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From… — initial checks
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved
All 6 Modi Biotech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.