Quick answers
What is this project?
No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From 210 Klpd to 282 Klpd by Enabling Usage of Mixture of Grain (Broken Rice & Maize), Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant is a proposed industrial building project in Bhilai, Arang, Raipur, Chhattisgarh. The site covers 17.7 acres.
Who is building it?
The applicant is Modi Biotech Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bhilai, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹192 crore and a site of 17.7 acres.
When was it filed?
The application was filed on 25 Sept 2025.
Project details
| Official title | No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From 210 Klpd to 282 Klpd by Enabling Usage of Mixture of Grain (Broken Rice & Maize), Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant at Village Bhilai, Tehsil Arang, District Raipur, Chhattisgarh by M/S. Modi Biotech Private Limited |
|---|---|
| Status | Initial checks |
| Status since | 25 Sept 2025 |
| Application filed | 25 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Modi Biotech Private Limited |
| Use | Industrial |
| Land area | 17.7 acres (7.2 ha) |
| Plot area | 71,700 m² (7,71,772 sq ft) |
| Project cost | ₹192 crore |
| Village / locality | Bhilai |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02587 |
In context
56 applications in Raipur since January 2022 are in the same category (Buildings & townships): 29 approved, 18 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 17.7 acres, this one is larger than 52% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhilai, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved, 0 m away
- Proposed 210 KLD Grain based Ethanol plant with ZLD — environmental approval granted, 0 m away
- 210 KLD Grain based Ethanol plant with ZLD — lapsed, 0 m away
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — environmental approval granted, 50 m away
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — cleared for impact study, 50 m away
- LIMESTONE (FLAGGY) QUARRY, VILLAGGE NISDA AREA 0.85 Ha PROJECT PROPONENT SHRI… — lapsed, 6.2 km away
- Flagstone Quarry, Village Nisda, Area 0.68 ha Project Proponent Naresh Ashani — lapsed, 6.2 km away
- Ms Nisda Lmestone (Flaggy Limestone)quarry, Village Nisda, Area 0.90 Acre… — lapsed, 6.3 km away
More from Modi Biotech Private Limited in Raipur
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — environmental approval granted
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — cleared for impact study
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved
- Proposed 210 KLD Grain based Ethanol plant with ZLD — environmental approval granted
- 210 KLD Grain based Ethanol plant with ZLD — lapsed
All 6 Modi Biotech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.