Quick answers
What is this project?
Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration Power Plant from 5 MW to 12 MW by M/s. Modi Biotech Private Limited is an approved industrial project in Bhilai, Arang, Raipur, Chhattisgarh. The site covers 32.2 acres.
Who is building it?
The applicant is Modi Biotech Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Oct 2026), as of 27 Nov 2026.
Where is it?
In Bhilai, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹442 crore and a site of 32.2 acres.
When was it filed?
The application was filed on 10 Sept 2026.
Project details
| Official title | Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration Power Plant from 5 MW to 12 MW along with proposed 10 KLPD Malt Spirit plant at Village Bhilai, Tehsil-Arang, District-Raipur, Chhattisgarh by M/s. Modi Biotech Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Oct 2026 |
| Application filed | 10 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Modi Biotech Private Limited |
| Land area | 32.2 acres (13 ha) |
| Project cost | ₹442 crore |
| Village / locality | Bhilai |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03423 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Sept 2026 (this page) | Environmental approval granted | 32.2 acres | ₹442 crore |
| Early planning filed 12 Jan 2026 | Cleared for impact study | 32.2 acres | ₹442 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 32.2 acres, this one is larger than 55% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhilai, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain based Distillery from 282 KLPD to 600 KLPD, Cogeneration… — cleared for impact study, 0 m away
- No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From… — initial checks, 50 m away
- Proposed 210 KLD Grain based Ethanol plant with ZLD — environmental approval granted, 50 m away
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved, 50 m away
- 210 KLD Grain based Ethanol plant with ZLD — lapsed, 50 m away
- LIMESTONE (FLAGGY) QUARRY, VILLAGGE NISDA AREA 0.85 Ha PROJECT PROPONENT SHRI… — lapsed, 6.2 km away
- Flagstone Quarry, Village Nisda, Area 0.68 ha Project Proponent Naresh Ashani — lapsed, 6.2 km away
- Ms Nisda Lmestone (Flaggy Limestone)quarry, Village Nisda, Area 0.90 Acre… — lapsed, 6.3 km away
More from Modi Biotech Private Limited in Raipur
- No Increase in Pollution Load for Expansion of Grain Based Ethanol Plant From… — initial checks
- Expansion of Grain Based Distillery Plant from 210 KLD to 500 KLD &… — not approved
- Proposed 210 KLD Grain based Ethanol plant with ZLD — environmental approval granted
- 210 KLD Grain based Ethanol plant with ZLD — lapsed
All 6 Modi Biotech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.