DRI Kilns (Sponge Iron – 6,27,000 TPA), Induction Furnaces with LRF + CCM (Billets / Ingots / Hot Billets) (3,96,000 TPA), Rolling Mill – 5,25,000 TPA (TMT / Wire Rod – 2,00,000 TPA, HR Strip Mill – 1,00,000 TPA, Structural Mill – 1,00,000 TPA & Pipe mill - 1,25,000 TPA), Gasifier (Producer gas) – 7000 Nm3/hour, Ferro Alloys Unit 2 x 9 MVA (FeSi-14,000 TPA (or) FeMn- 50,400 TPA (or) SiMn –28,800 TPA (or) Pig Iron– 50,400 TPA), WHRB based Power Plant – 46 MW & CFBC based Power

DRI Kilns (Sponge Iron – 6,27,000 TPA), Induction Furnaces with LRF + CCM (Billets / Ingots / Hot Billets) (3,96,000 TPA), Rolling Mill – 5,25,000 TPA (TMT / Wire Rod – 2,00,000 TPA, HR Strip Mill – 1,00,000 TPA, Structural Mill – 1,00,000 TPA & Pipe mill - 1,25,000 TPA), Gasifier (Producer gas) – 7000 Nm3/hour, Ferro Alloys Unit 2 x 9 MVA (FeSi-14,000 TPA (or) FeMn- 50,400 TPA (or) SiMn –28,800 TPA (or) Pig Iron– 50,400 TPA), WHRB based Power Plant – 46 MW & CFBC based Power is a withdrawn industrial project in Ghughuwadih (Ghughwadih, Simga, Baloda Bazar, Chhattisgarh. The site covers 176.6 acres. Its stated project cost is ₹580 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 12 Dec 2023).

See it on the live map All projects in Baloda Bazar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: DRI Kilns (Sponge Iron – 6,27,000 TPA), Induction Furnaces with LRF + CCM (Billets /…

Project details

Official titleEstablishment of DRI Kilns (Sponge Iron – 6,27,000 TPA), Induction Furnaces with LRF + CCM (Billets / Ingots / Hot Billets) (3,96,000 TPA), Rolling Mill – 5,25,000 TPA (TMT / Wire Rod – 2,00,000 TPA, HR Strip Mill – 1,00,000 TPA, Structural Mill – 1,00,000 TPA & Pipe mill - 1,25,000 TPA), Gasifier (Producer gas) – 7000 Nm3/hour, Ferro Alloys Unit 2 x 9 MVA (FeSi-14,000 TPA (or) FeMn- 50,400 TPA (or) SiMn –28,800 TPA (or) Pig Iron– 50,400 TPA), WHRB based Power Plant – 46 MW & CFBC based Power
StatusWithdrawn
Status since12 Dec 2023
Application filed9 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGos Ispat Private Limited
Land area176.6 acres (71.5 ha)
Project cost₹580 crore
Village / localityGhughuwadih (Ghughwadih
Taluk / tehsilSimga
DistrictBaloda Bazar
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00249

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Dec 2023Environmental approval granted176.6 acres₹580 crore
Early planning filed 9 Dec 2023 (this page)Withdrawn176.6 acres₹580 crore

In context

31 applications in Baloda Bazar since January 2022 are in the same category (Industry): 21 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 176.6 acres, this one is smaller than 58% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghughuwadih (Ghughwadih, Simga, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gos Ispat Private Limited in Baloda Bazar

All 4 Gos Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.