Quick answers
What is Industrial project by Mahavir Iron & Steel Pvt. Ltd.?
This proposed industrial project by Mahavir Iron & Steel Pvt. Ltd. is in Mundrethi, Raipur, Chhattisgarh. The site covers 2.4 acres.
Who is building it?
The applicant is Shri Mahavir Iron & Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 May 2023), as of 27 Nov 2026.
Where is it?
In Mundrethi, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹3.3 crore and a site of 2.4 acres.
When was it filed?
The application was filed on 21 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 May 2023 |
| Application filed | 21 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shri Mahavir Iron & Steel Private Limited |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Mundrethi |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00315 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.4 acres, this one is smaller than 86% of them.
60 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mundrethi, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — environmental approval granted, 200 m away
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — cleared for impact study, 200 m away
- Change in Name Due to Change in Constitution From Partnership Firm to Company,… — environmental approval granted, 250 m away
- Shri Mahavir Iron & Steel Pvt. Ltd. (Unit – II) — lapsed, 250 m away
- As per requirement of EIA Notification, 2006 [as amended to the date] this is… — initial checks, 500 m away
- Proposed "increase in Production Capacity of Existing 2 X 350 Tpd Sponge Iron… — initial checks, 600 m away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 600 m away
- M/s Sunil Sponge Pvt. Ltd.( Rolling Mill Division Unit-II) Plot No. 94, 95… — lapsed, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.