Quick answers
What is this project?
Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of Induction Furnace, CCM with Hot Charging based Steel Rolling Mill from 30000 TPA to 5,00,000 TPA MS Billets/rerolled Steel Production is a proposed industrial project in Mundrethi, Raipur, Chhattisgarh. The site covers 39.6 acres.
Who is building it?
The applicant is Om Sponge.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Oct 2023), as of 27 Nov 2026.
Where is it?
In Mundrethi, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹51.6 crore and a site of 39.6 acres.
When was it filed?
The application was filed on 12 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of Induction…
Project details
| Official title | Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of Induction Furnace, CCM with Hot Charging based Steel Rolling Mill from 30000 TPA to 5,00,000 TPA MS Billets/rerolled Steel Production; along with Permitted Capacity of WHRB and Biomass based Power Plant and Fly Ash Brick Plant by M/s. OM Sponge at Village - Munrethi; Block - Dharsiwa, Tehsil & District - Raipur (CG). (Accredited Environmental Consultant: Anacon Labs. Pvt. Ltd.) |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Oct 2023 |
| Application filed | 12 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Om Sponge |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹51.6 crore |
| Village / locality | Mundrethi |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00338 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Aug 2024 | Environmental approval granted | 39.6 acres | ₹51.6 crore |
| Early planning filed 12 Oct 2023 (this page) | Cleared for impact study | 39.6 acres | ₹51.6 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.6 acres, this one is larger than 58% of them.
59 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mundrethi, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — environmental approval granted, 0 m away
- Change in Name Due to Change in Constitution From Partnership Firm to Company,… — environmental approval granted, 50 m away
- Industrial project by Mahavir Iron & Steel Pvt. Ltd. — cleared for impact study, 200 m away
- Shri Mahavir Iron & Steel Pvt. Ltd. (Unit – II) — lapsed, 300 m away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 500 m away
- As per requirement of EIA Notification, 2006 [as amended to the date] this is… — initial checks, 750 m away
- Proposed "increase in Production Capacity of Existing 2 X 350 Tpd Sponge Iron… — initial checks, 800 m away
- "Expansion of Integrated Steel Plant" by M/s SKS Ispat and Power Limited — lapsed, 800 m away
More from Om Sponge in Raipur
- Change in Name Due to Change in Constitution From Partnership Firm to Company,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.