What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raipur, Chhattisgarh

Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA), Induction Furnace with LRF& CCM (Hot Billets / MS Billets / MS Slab–1,48,500 TPA), Rolling Mill(TMT Bars, Structural Steel - Angle, Channels, Gutters, Coils, Flat Bars, Strips, MS Pipes, MS Tubes, Galvanized Pipes and angles(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO/Producer Gas as fuel–1,40,250 TPA),Coal Gasifier for Rolling Mill (1200 NM3/ Hr), M.S. Pipe Plant- 1,00,000 TPA, Ferro Alloys

Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA), Induction Furnace with LRF& CCM (Hot Billets / MS Billets / MS Slab–1,48,500 TPA), Rolling Mill(TMT Bars, Structural Steel - Angle, Channels, Gutters, Coils, Flat Bars, Strips, MS Pipes, MS Tubes, Galvanized Pipes and angles(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO/Producer Gas as fuel–1,40,250 TPA),Coal Gasifier for Rolling Mill (1200 NM3/ Hr), M.S. Pipe Plant- 1,00,000 TPA, Ferro Alloys is a proposed industrial project in Nakti Khapri, Tilda, Raipur, Chhattisgarh. The site covers 74.7 acres. Its stated project cost is ₹185 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Apr 2023).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA), Induction Furnace with LRF& CCM (Hot Billets / MS Billets / MS Slab–1,48,500 TPA), Rolling Mill(TMT Bars, Structural Steel - Angle, Channels, Gutters, Coils, Flat Bars, Strips, MS Pipes, MS Tubes, Galvanized Pipes and angles(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO/Producer Gas as fuel–1,40,250 TPA),Coal Gasifier for Rolling Mill (1200 NM3/ Hr), M.S. Pipe Plant- 1,00,000 TPA, Ferro Alloys is a proposed industrial project in Nakti Khapri, Tilda, Raipur, Chhattisgarh. The site covers 74.7 acres.

Who is building it?

The applicant is Msm & Sndb Ispat & Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Apr 2023), as of 27 Nov 2026.

Where is it?

In Nakti Khapri, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹185 crore and a site of 74.7 acres.

When was it filed?

The application was filed on 11 Apr 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA), Induction…

Project details

StatusCleared for impact study
Status since21 Apr 2023
Application filed11 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMsm & Sndb Ispat & Power Private Limited
Land area74.7 acres (30.2 ha)
Project cost₹185 crore
Village / localityNakti Khapri
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00389

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 May 2024Environmental approval granted74.7 acres₹185 crore
Early planning filed 11 Apr 2023 (this page)Cleared for impact study74.7 acres₹185 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 74.7 acres, this one is larger than 79% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nakti Khapri, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Msm & Sndb Ispat & Power Private Limited in Raipur

All 3 Msm & Sndb Ispat & Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.