What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raipur, Chhattisgarh

Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA) I.F with LRF & CCM (MS Billets /Ingots)(3,24,000TPA)Rerolled steel products through hot charging and RHF 3,00,000TPA (2,40,000 TPA through hot charging & 60,000 TPA through billet RHF with Producer Gas) Si-Mn 36,000TPA OR Fe-Mn 46,000 TPA OR Fe-Si 20,000 TPA Or Pig Iron 63,000 TPA(9 MVAX2)WHRB Power Plant 3 x5MW,AFBC 2x10MW Pipe mill/Tube mill & galvanized unit 100500 TPA brick manufacturing 36000No/day

Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA) I.F with LRF & CCM (MS Billets /Ingots)(3,24,000TPA)Rerolled steel products through hot charging and RHF 3,00,000TPA (2,40,000 TPA through hot charging & 60,000 TPA through billet RHF with Producer Gas) Si-Mn 36,000TPA OR Fe-Mn 46,000 TPA OR Fe-Si 20,000 TPA Or Pig Iron 63,000 TPA(9 MVAX2)WHRB Power Plant 3 x5MW,AFBC 2x10MW Pipe mill/Tube mill & galvanized unit 100500 TPA brick manufacturing 36000No/day is a proposed industrial project in Konari, Tilda, Raipur, Chhattisgarh. The site covers 29.3 acres. Its stated project cost is ₹700 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Sept 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA) I.F with LRF & CCM (MS Billets /Ingots)(3,24,000TPA)Rerolled steel products through hot charging and RHF 3,00,000TPA (2,40,000 TPA through hot charging & 60,000 TPA through billet RHF with Producer Gas) Si-Mn 36,000TPA OR Fe-Mn 46,000 TPA OR Fe-Si 20,000 TPA Or Pig Iron 63,000 TPA(9 MVAX2)WHRB Power Plant 3 x5MW,AFBC 2x10MW Pipe mill/Tube mill & galvanized unit 100500 TPA brick manufacturing 36000No/day is a proposed industrial project in Konari, Tilda, Raipur, Chhattisgarh. The site covers 29.3 acres.

Who is building it?

The applicant is Srs Steel and Power.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Sept 2024), as of 27 Nov 2026.

Where is it?

In Konari, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹700 crore and a site of 29.3 acres.

When was it filed?

The application was filed on 9 Jul 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA) I.F with…

Project details

Official titleEstablishment of Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA) I.F with LRF & CCM (MS Billets /Ingots)(3,24,000TPA)Rerolled steel products through hot charging and RHF 3,00,000TPA (2,40,000 TPA through hot charging & 60,000 TPA through billet RHF with Producer Gas) Si-Mn 36,000TPA OR Fe-Mn 46,000 TPA OR Fe-Si 20,000 TPA Or Pig Iron 63,000 TPA(9 MVAX2)WHRB Power Plant 3 x5MW,AFBC 2x10MW Pipe mill/Tube mill & galvanized unit 100500 TPA brick manufacturing 36000No/day
StatusCleared for impact study
Status since16 Sept 2024
Application filed9 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSrs Steel and Power
Land area29.3 acres (11.9 ha)
Project cost₹700 crore
Village / localityKonari
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00957

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jun 2026Environmental approval granted29.3 acres₹700 crore
Early planning filed 9 Jul 2024 (this page)Cleared for impact study29.3 acres₹700 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.3 acres, this one is larger than 53% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Konari, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.