Quick answers
What is this project?
Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron – 1,32,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 1,65,000 TPA), Strip Mill (Strips) (85 % Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas/Coal Pulveriser as fuel – 1,65,000 TPA), Submerged Electric Arc Furnace (FeSi - 14,000 TPA / FeMn – 50,400 TPA / SiMn – 28,800 TPA / FeCr - 30,000 TPA / Pig Iron – 50,400 TPA), WHRB based Power Plant – 2 x 5.0 MW, FB is an approved industrial project in Nakti Khapri, Tilda, Raipur, Chhattisgarh. The site covers 55.4 acres.
Who is building it?
The applicant is Iskco Iron & Steel Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Jul 2024), as of 27 Nov 2026.
Where is it?
In Nakti Khapri, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹195 crore and a site of 55.4 acres.
When was it filed?
The application was filed on 11 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jul 2024 |
| Application filed | 11 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Iskco Iron & Steel Private Limited |
| Land area | 55.4 acres (22.4 ha) |
| Project cost | ₹195 crore |
| Village / locality | Nakti Khapri |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01398 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Apr 2024 (this page) | Environmental approval granted | 55.4 acres | ₹195 crore |
| Early planning filed 11 Apr 2023 | Cleared for impact study | 55.4 acres | ₹195 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.4 acres, this one is larger than 72% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nakti Khapri, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environment Clearance vide no. IA-J-11011/88/2023-IA-II(IND-I) dt.… — environmental approval granted, 0 m away
- Proposed Change in the DRI plant configuration from 2 x 200 TPD Kilns to 1 x… — initial checks, 0 m away
- Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron –… — cleared for impact study, 0 m away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 450 m away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — environmental approval granted, 450 m away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — cleared for impact study, 450 m away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — environmental approval granted, 1.5 km away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — cleared for impact study, 1.5 km away
More from Iskco Iron & Steel Private Limited in Raipur
All 3 Iskco Iron & Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.