Quick answers
What is this project?
Proposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock is an approved industrial project in Raweli, Bemetara, Bametara, Chhattisgarh. The site covers 35 acres.
Who is building it?
The applicant is Deshail Biotech Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Apr 2023), as of 27 Nov 2026.
Where is it?
In Raweli, Bemetara, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹150 crore and a site of 35 acres.
When was it filed?
The application was filed on 11 Apr 2023.
Project details
| Official title | Proposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock along with 2.5 MW CPP (Under EBP Mission) at Village Raweli, Tehsil Bematara, Dist., Bemetara, Chhattisgarh by M/s. Deshail Biotech Pvt. Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Apr 2023 |
| Application filed | 11 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Deshail Biotech Private Limited |
| Land area | 35 acres (14.2 ha) |
| Project cost | ₹150 crore |
| Village / locality | Raweli |
| Taluk / tehsil | Bemetara |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00426 |
In context
24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35 acres, this one is smaller than 75% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raweli, Bemetara, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield steel plant comprising of Iron ore beneficiation (8,50,000 TPA),… — withdrawn, 3.9 km away
- Greenfield steel plant comprising of Iron ore beneficiation (8,50,000 TPA),… — environmental approval granted, 3.9 km away
- Increase in Bio Ethanol and Bye Product Production Due to Proposed Improvement… — initial checks, 11.5 km away
- Dokla Bricks Earth Quarry — environmental approval granted, 18.5 km away
- Request for Amendment to Environmental Clearance (EC) issued to BIOTECH FUELS… — environmental approval granted, 20 km away
- Proposed "enhancement in Ethanol (Grain based) Production Capacity from 65… — initial checks, 20 km away
- Grain Based Distllery Palnt Capacity of 1 X 65 Klpd — environmental approval granted, 20 km away
- Brick Earth Quarry — environmental approval granted, 21.3 km away