Environmental approval grantedIndustry · Bametara, Chhattisgarh

Proposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock

Proposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock is an approved industrial project in Raweli, Bemetara, Bametara, Chhattisgarh. The site covers 35 acres. Its stated project cost is ₹150 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Apr 2023).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock is an approved industrial project in Raweli, Bemetara, Bametara, Chhattisgarh. The site covers 35 acres.

Who is building it?

The applicant is Deshail Biotech Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 11 Apr 2023), as of 27 Nov 2026.

Where is it?

In Raweli, Bemetara, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹150 crore and a site of 35 acres.

When was it filed?

The application was filed on 11 Apr 2023.

Project details

Official titleProposed 100 KLPD Fuel Ethanol Unit by using Grain as Feed Stock along with 2.5 MW CPP (Under EBP Mission) at Village Raweli, Tehsil Bematara, Dist., Bemetara, Chhattisgarh by M/s. Deshail Biotech Pvt. Limited
StatusEnvironmental approval granted
Status since11 Apr 2023
Application filed11 Apr 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantDeshail Biotech Private Limited
Land area35 acres (14.2 ha)
Project cost₹150 crore
Village / localityRaweli
Taluk / tehsilBemetara
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00426

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35 acres, this one is smaller than 75% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Raweli, Bemetara, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.