Quick answers
What is this project?
Regularization of the existing project of Rolling Mill having capacity of Re-Rolled Products (M.S. Round, Ribbed Bar, CTD Bars, Flates,Square,Angle,Channel & Gate Channel)30,000 Metric TPA located at Plot no 2 & 3 (Part), Industrial Area Rawabhata, District- Raipur (C.G.).by Sarwottam Ispat is a proposed industrial project in Ranwabhata, Raipur, Chhattisgarh. The site covers 1.1 acres.
Who is building it?
The applicant is Dilip Chhugani.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 May 2023), as of 27 Nov 2026.
Where is it?
In Ranwabhata, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹43 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 3 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 May 2023 |
| Application filed | 3 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Dilip Chhugani |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Ranwabhata |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00466 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 96% of them.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranwabhata, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sindh Ispat — cleared for impact study, 100 m away
- Shri Ram Rolling (SMS Division) — lapsed, 450 m away
- Expansion of Existing Steel Plant -M. S Ingots/Billets From 59400 Tpa to… — returned to applicant, 700 m away
- Industrial project by Om Swaroop Ispat Private Limited — environmental approval granted, 2.9 km away
- Expansion of Manufacturing of Ferro Alloys from 48,000 TPA to 64,000 TPA — environmental approval granted, 2.9 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — environmental approval granted, 2.9 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — returned to applicant, 2.9 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.