Quick answers
What is this project?
Expansion of Existing Steel Plant -M. S Ingots/Billets From 59400 Tpa to 155000 Tpa; Re-Rolled Product Through Hot Charging Based Rolling Mill From 56,430 Tpa to 1,50,000 Tpa by Indian Ispat Works PVT LTD Located at Plot No 36 (Part),37 & 38, Industrial Area Rawabhata , Tehsil & District-Raipur (C.G) is a proposed industrial project in Ranwabhata, Raipur, Chhattisgarh. The site covers 3.6 acres.
Who is building it?
The applicant is Indian Ispat Works Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Ranwabhata, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹12.2 crore and a site of 3.6 acres.
When was it filed?
The application was filed on 17 Oct 2023.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 15 Nov 2023 |
| Application filed | 17 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Indian Ispat Works Private Limited |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹12.2 crore |
| Village / locality | Ranwabhata |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00534 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 80% of them.
59 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranwabhata, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Ram Rolling (SMS Division) — lapsed, 200 m away
- Regularization of the existing project of Rolling Mill having capacity of… — cleared for impact study, 700 m away
- Sindh Ispat — cleared for impact study, 750 m away
- Industrial project by Om Swaroop Ispat Private Limited — environmental approval granted, 2.3 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — environmental approval granted, 2.4 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — returned to applicant, 2.4 km away
- Expansion of Ferro Alloys Manufacturing Unit from 64,000 TPA to 88,000 TPA… — lapsed, 2.4 km away
- Expansion of Manufacturing of Ferro Alloys from 48,000 TPA to 64,000 TPA — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.