What is Developing? Open the mapMap

Environmental approval grantedIndustry · Raipur, Chhattisgarh

Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars / Structural Steel) (2,25,000 TPA), Brick manufacturing unit – 25,000 bricks/day, WHRB based Power Plant – 18 MW (3 x 6 MW), AFBC based Power Plant - 6 MW

Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars / Structural Steel) (2,25,000 TPA), Brick manufacturing unit – 25,000 bricks/day, WHRB based Power Plant – 18 MW (3 x 6 MW), AFBC based Power Plant - 6 MW is an approved industrial project in Chicholi, Tilda, Raipur, Chhattisgarh. The site covers 129.5 acres. Its stated project cost is ₹435 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Jan 2023).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars / Structural Steel) (2,25,000 TPA), Brick manufacturing unit – 25,000 bricks/day, WHRB based Power Plant – 18 MW (3 x 6 MW), AFBC based Power Plant - 6 MW is an approved industrial project in Chicholi, Tilda, Raipur, Chhattisgarh. The site covers 129.5 acres.

Who is building it?

The applicant is Itechc Metals Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 19 Jan 2023), as of 27 Nov 2026.

Where is it?

In Chicholi, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹435 crore and a site of 129.5 acres.

When was it filed?

The application was filed on 19 Jan 2023.

Project details

Official titleEstablishment of Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars / Structural Steel) (2,25,000 TPA), Brick manufacturing unit – 25,000 bricks/day, WHRB based Power Plant – 18 MW (3 x 6 MW), AFBC based Power Plant - 6 MW
StatusEnvironmental approval granted
Status since19 Jan 2023
Application filed19 Jan 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantItechc Metals Private Limited
Land area129.5 acres (52.4 ha)
Project cost₹435 crore
Village / localityChicholi
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00608

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 129.5 acres, this one is larger than 84% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chicholi, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.