Quick answers
What is this project?
Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance to the MoEF&CC Notification dated 20th July 2022 at P.H. No. -13, Khasra No. 7 Part & 8 Part, Village – Konari, Teh. -Tilda, Dist.-Raipur, Chhattisgarh by M/s Ferrum Tubes Pvt. Ltd is a proposed industrial project in Konari, Tilda, Raipur, Chhattisgarh. The site covers 12.8 acres.
Who is building it?
The applicant is Ferrum Tubes Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Apr 2023), as of 27 Nov 2026.
Where is it?
In Konari, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹11 crore and a site of 12.8 acres.
When was it filed?
The application was filed on 7 Apr 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Apr 2023 |
| Application filed | 7 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ferrum Tubes Private Limited |
| Land area | 12.8 acres (5.2 ha) |
| Project cost | ₹11 crore |
| Village / locality | Konari |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00176 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.8 acres, this one is smaller than 58% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Konari, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — environmental approval granted, 450 m away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — cleared for impact study, 450 m away
- Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM… — environmental approval granted, 1000 m away
- Transfer of Environment Clearance vide no. IA-J-11011/278/2020-IA-II(IND-I)… — environmental approval granted, 1.3 km away
- Sponge Iron unit (1,32,000 TPA), Induction Furnace with matching LRF & CCM… — environmental approval granted, 1.3 km away
- Sponge Iron unit (1,32,000 TPA), Induction Furnace with matching LRF & CCM… — cleared for impact study, 1.3 km away
- Speciality Chemical Manufacturing Unit — cleared for impact study, 1.3 km away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.