Quick answers
What is this project?
Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnaces with matching LRF & CCM (Hot Billets / Billets / Ingots – 1,98,000 TPA), Rolling Mills (TMT bars / Structural Steel) (85% Hot charging with Hot Billets and remaining 15% through RHF with Gasifer as fuel – 1,98,000 TPA), Coal Gasifier – 1700 NM3/Hr., Ferro Alloy Unit 1 x 9 MVA (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA/FeCr – 15,000 TPA/ Pig Iron - 24,000 TPA), Briquetting Plant (100 K is a proposed industrial project in Kopedih, Rajnandgaon, Chhattisgarh. The site covers 28.9 acres.
Who is building it?
The applicant is Kritika Steels Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Jan 2024), as of 27 Nov 2026.
Where is it?
In Kopedih, Rajnandgaon, Chhattisgarh.
How big is it?
It has a stated cost of ₹325 crore and a site of 28.9 acres.
When was it filed?
The application was filed on 15 Dec 2023.
Project details
| Official title | Establishment of Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnaces with matching LRF & CCM (Hot Billets / Billets / Ingots – 1,98,000 TPA), Rolling Mills (TMT bars / Structural Steel) (85% Hot charging with Hot Billets and remaining 15% through RHF with Gasifer as fuel – 1,98,000 TPA), Coal Gasifier – 1700 NM3/Hr., Ferro Alloy Unit 1 x 9 MVA (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA/FeCr – 15,000 TPA/ Pig Iron - 24,000 TPA), Briquetting Plant (100 K |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Jan 2024 |
| Application filed | 15 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kritika Steels Private Limited |
| Land area | 28.9 acres (11.7 ha) |
| Project cost | ₹325 crore |
| Village / locality | Kopedih |
| Taluk / tehsil | Rajnandgaon |
| District | Rajnandgaon |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00617 |
In context
20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 28.9 acres, this one is smaller than 85% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kopedih, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant From 0.4785 Mtpa to 0.9285 Mtpa Finished… — under environmental review, 350 m away
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — environmental approval granted, 350 m away
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — cleared for impact study, 350 m away
- M/s. SMS WATERGRACE ENVIROPROTECT PRIVATE LIMITED proposed a new CBMWTF at… — lapsed, 950 m away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — environmental approval granted, 1.3 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — returned to applicant, 1.3 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — cleared for impact study, 1.3 km away
- Expansion of Steel Plant and Regularization of partly constructed Iron Ore… — more information requested, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.