Quick answers
What is Mining project by Bharat Coal Washery Private Limited?
This approved mining project by Bharat Coal Washery Private Limited is in Bhengari, Gharghoda, Raigarh, Chhattisgarh. The site covers 43.2 acres.
Who is building it?
The applicant is Bharat Coal Washery Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Jul 2023), as of 27 Nov 2026.
Where is it?
In Bhengari, Gharghoda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹57 lakh and a site of 43.2 acres.
When was it filed?
The application was filed on 14 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2023 |
| Application filed | 14 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Bharat Coal Washery Private Limited |
| Land area | 43.2 acres (17.5 ha) |
| Project cost | ₹57 lakh |
| Village / locality | Bhengari |
| Taluk / tehsil | Gharghoda |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00706 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 43.2 acres, this one is larger than 70% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bhengari, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000TPA to 2,40,000… — environmental approval granted, 5.9 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000TPA to 2,40,000… — cleared for impact study, 5.9 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — under environmental review, 6.9 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study, 6.9 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study, 6.9 km away
- Coal Washery and Railway Siding — lapsed, 7.1 km away
- Railway Siding — more information requested, 7.2 km away
- Railway Siding — lapsed, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.