Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge Iron(858000TPA),Billets(IF)(792000TPA),Billets(EAF)(330000TPA),Rolled Prod (RM)(792000TPA)+PGP(40000 NM3/Hr),Coal Washery(2.25MTPA),SEAF(FeSi-85000TPA/FeMn-240000TPA/SiMn-160000TPA/FeCr-180000TPA/Pig Iron-280000TPA),Briquettes(1000Kg/hr),Jigging(10000TPA),Sinter(132000TPA),AOD 198000TPA(MC FeMn/LC FeMn/MC FeCr/LC FeCr),Argon(19.8Mm3),Oxygen(99Mm3),Nitrogen(297Mm3),Slag Crusher(50TPH),WHRB(100 MW)&CFBC(100MW)

Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge Iron(858000TPA),Billets(IF)(792000TPA),Billets(EAF)(330000TPA),Rolled Prod (RM)(792000TPA)+PGP(40000 NM3/Hr),Coal Washery(2.25MTPA),SEAF(FeSi-85000TPA/FeMn-240000TPA/SiMn-160000TPA/FeCr-180000TPA/Pig Iron-280000TPA),Briquettes(1000Kg/hr),Jigging(10000TPA),Sinter(132000TPA),AOD 198000TPA(MC FeMn/LC FeMn/MC FeCr/LC FeCr),Argon(19.8Mm3),Oxygen(99Mm3),Nitrogen(297Mm3),Slag Crusher(50TPH),WHRB(100 MW)&CFBC(100MW) is a proposed industrial project in Charmar, Gharghoda, Raigarh, Chhattisgarh. The site covers 355.7 acres. Its stated project cost is ₹16.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Sept 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge Iron(858000TPA),Billets(IF)(792000TPA),Billets(EAF)(330000TPA),Rolled Prod (RM)(792000TPA)+PGP(40000 NM3/Hr),Coal Washery(2.25MTPA),SEAF(FeSi-85000TPA/FeMn-240000TPA/SiMn-160000TPA/FeCr-180000TPA/Pig Iron-280000TPA),Briquettes(1000Kg/hr),Jigging(10000TPA),Sinter(132000TPA),AOD 198000TPA(MC FeMn/LC FeMn/MC FeCr/LC FeCr),Argon(19.8Mm3),Oxygen(99Mm3),Nitrogen(297Mm3),Slag Crusher(50TPH),WHRB(100 MW)&CFBC(100MW) is a proposed industrial project in Charmar, Gharghoda, Raigarh, Chhattisgarh. The site covers 355.7 acres.

Who is building it?

The applicant is B.S.Sponge Private LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Sept 2026), as of 27 Nov 2026.

Where is it?

In Charmar, Gharghoda, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹16.4 crore and a site of 355.7 acres.

When was it filed?

The application was filed on 6 May 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge…

Project details

StatusCleared for impact study
Status since5 Sept 2026
Application filed6 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantB.S.Sponge Private LTD
Land area355.7 acres (144 ha)
Project cost₹16.4 crore
Village / localityCharmar
Taluk / tehsilGharghoda
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03222

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Nov 2026Under environmental review355.7 acres₹16.4 crore
Ownership transfer filed 13 Oct 2026Cleared for impact study355.7 acres₹16.4 crore
Early planning filed 6 May 2026 (this page)Cleared for impact study355.7 acres₹16.4 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 355.7 acres, this one is larger than 84% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Charmar, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (12.1 km away).

Other projects nearby

More from B.S.Sponge Private LTD in Raigarh

All 9 B.S.Sponge projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.