Expansion project to produce MS Billets 3,20,000 TPA, Rerolled Steel Products 3,38,000 TPA (through Hot Charging 1,88,000 TPA; and through Reheating Furnace from existing 30,000 TPA to 1,50,000 TPA) ; MS Black Pipe (30,000 TPA to 2,10,000 TPA); Galvanizing Plant (51,000 TPA to 1,00,000 TPA) with addition of SAF - 3.6 MVA (to produce SiMn/FeMn/FeSi/Pig Iron) by M/s. Blackrock Steel & Power Pvt. Ltd is a proposed industrial project in Galtara, Tilda, Raipur, Chhattisgarh. The site covers 11.1 acres.
Who is building it?
The applicant is Blackrock Steel & Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Sept 2023), as of 27 Nov 2026.
Where is it?
In Galtara, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹95 crore and a site of 11.1 acres.
When was it filed?
The application was filed on 28 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion project to produce MS Billets 3,20,000 TPA, Rerolled Steel Products 3,38,000…
Project details
| Official title | Expansion project to produce MS Billets 3,20,000 TPA, Rerolled Steel Products 3,38,000 TPA (through Hot Charging 1,88,000 TPA; and through Reheating Furnace from existing 30,000 TPA to 1,50,000 TPA) ; MS Black Pipe (30,000 TPA to 2,10,000 TPA); Galvanizing Plant (51,000 TPA to 1,00,000 TPA) with addition of SAF - 3.6 MVA (to produce SiMn/FeMn/FeSi/Pig Iron) located at Village Raikheda, Tehsil Kharora, District Raipur (C.G.) by M/s. Blackrock Steel & Power Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 Sept 2023 |
| Application filed | 28 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Blackrock Steel & Power Private Limited |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹95 crore |
| Village / locality | Galtara |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00721 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 15 May 2026 | Environmental approval granted | 11.1 acres | ₹95 crore |
| Early planning filed 28 Jul 2023 (this page) | Cleared for impact study | 11.1 acres | ₹95 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is smaller than 60% of them.
44 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Galtara, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion project to produce MS Billets 3,20,000 TPA, Rerolled Steel Products… — environmental approval granted, 0 m away
- Industrial project by Anjani wires Pvt. Ltd. — more information requested, 1.3 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — under environmental review, 1.5 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — more information requested, 1.5 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — cleared for impact study, 1.5 km away
- Project by Shri Baba Baidnath Ispat Private Limited — initial checks, 2 km away
- 2x685 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant… — environmental approval granted, 2.1 km away
- Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW… — environmental approval granted, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.