What is Developing? Open the mapMap

Cleared for impact studyPower · Raipur, Chhattisgarh

Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW + Phase II (2x800)MW] to 4570 MW by adding 2x800 MW (Under Phase III) Ultra Super Critical TPP at Villages Raikheda, Gaitara & Chicholi, Tilda Block, Raipur District, Chhattisgarh by Adani Power Limited, Raipur

Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW + Phase II (2x800)MW] to 4570 MW by adding 2x800 MW (Under Phase III) Ultra Super Critical TPP at Villages Raikheda, Gaitara & Chicholi, Tilda Block, Raipur District, Chhattisgarh by Adani Power Limited, Raipur is a proposed power project in Galtara, Tilda, Raipur, Chhattisgarh. The site covers 1,430.3 acres. Its stated project cost is ₹37,630 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jul 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW + Phase II (2x800)MW] to 4570 MW by adding 2x800 MW (Under Phase III) Ultra Super Critical TPP at Villages Raikheda, Gaitara & Chicholi, Tilda Block, Raipur District, Chhattisgarh by Adani Power Limited, Raipur is a proposed power project in Galtara, Tilda, Raipur, Chhattisgarh. The site covers 1,430.3 acres.

Who is building it?

The applicant is Adani Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jul 2026), as of 27 Nov 2026.

Where is it?

In Galtara, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹37,630 crore and a site of 1,430.3 acres.

When was it filed?

The application was filed on 13 Apr 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW + Phase II…

Project details

StatusCleared for impact study
Status since17 Jul 2026
Application filed13 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantAdani Power Limited
Land area1,430.3 acres (578.8 ha)
Project cost₹37,630 crore
Village / localityGaltara
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03738

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 30 Oct 2026Under environmental review1,430.3 acres₹37,630 crore
Amendment filed 19 Oct 2026More information requested1,430.3 acres₹37,630 crore
Early planning filed 13 Apr 2026 (this page)Cleared for impact study1,430.3 acres₹37,630 crore

In context

13 applications in Raipur since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 1,430.3 acres, this one is larger than 77% of them.

40 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Galtara, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adani Power Limited in Raipur

9 Adani Power projects in Raipur
All 68 Adani Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.