Quick answers
What is this project?
Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW Ultra Super-Critical to existing 1370 (2x685) MW in CSIDC Industrial Area is an approved power project in Raikhera, Tilda, Raipur, Chhattisgarh. The site covers 885 acres.
Who is building it?
The applicant is Adani Power Ltd..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Nov 2024), as of 27 Nov 2026.
Where is it?
In Raikhera, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹21,890 crore and a site of 885 acres.
When was it filed?
The application was filed on 17 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW Ultra…
Project details
| Official title | Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW Ultra Super-Critical to existing 1370 (2x685) MW in CSIDC Industrial Area, at Village Raikheda, Gaitara & Chicholi, Tilda Block, Raipur District, Chhattisgarh by Adani Power Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Nov 2024 |
| Application filed | 17 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Adani Power Ltd. |
| Land area | 885 acres (358.2 ha) |
| Project cost | ₹21,890 crore |
| Village / locality | Raikhera |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02106 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Sept 2024 (this page) | Environmental approval granted | 885 acres | ₹21,890 crore |
| Early planning filed 7 Jul 2023 | Cleared for impact study | 885 acres | ₹21,890 crore |
In context
13 applications in Raipur since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 885 acres, this one is larger than 54% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raikhera, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2x685 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant… — environmental approval granted, 0 m away
- Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW… — cleared for impact study, 0 m away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — under environmental review, 750 m away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — more information requested, 750 m away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — cleared for impact study, 750 m away
- Residential Township of Raipur Thermal Power Plant by Adani Power Limited — environmental approval granted, 1 km away
- Residential Township of Raipur Thermal Power Plant by Adani Power Limited — withdrawn, 1 km away
- Project by Shri Baba Baidnath Ispat Private Limited — initial checks, 2.1 km away
9 Adani Power projects in Raipur
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.