Quick answers
What is this project?
Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge Rolling Mill of 1,80,000 TPA is an approved industrial project in Charoda, Raipur, Chhattisgarh. The site covers 12.7 acres.
Who is building it?
The applicant is M/S. Shyam Steel Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Nov 2024), as of 27 Nov 2026.
Where is it?
In Charoda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹20.5 crore and a site of 12.7 acres.
When was it filed?
The application was filed on 30 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Nov 2024 |
| Application filed | 30 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/S. Shyam Steel Industries |
| Land area | 12.7 acres (5.2 ha) |
| Project cost | ₹20.5 crore |
| Village / locality | Charoda |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01089 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Mar 2024 (this page) | Environmental approval granted | 12.7 acres | ₹20.5 crore |
| Expansion filed 23 Nov 2023 | Returned to applicant | 12.7 acres | ₹20.5 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.7 acres, this one is smaller than 59% of them.
53 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Charoda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance (EC) from M/s. Shyam Steel Industries to… — under environmental review, 0 m away
- Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge… — returned to applicant, 0 m away
- Expansion of Production Facilities of Induction Furnace With Ccm From Existing… — cleared for impact study, 250 m away
- Transfer of Environmental clearance (EC) from M/s SKS Ispat Limited to M/s SKS… — under environmental review, 1.3 km away
- Transfer for Environment Clearance due to change in ownership from Rashmi… — more information requested, 1.3 km away
- "Expansion of Integrated Steel Plant" by M/s SKS Ispat and Power Limited — lapsed, 1.4 km away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 1.6 km away
- Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron… — lapsed, 1.7 km away